What We Offer
Hydroblasting Services
Chemical Cleaning Services
Vacuum Services
Tank Cleaning Services
Oilfield Services
Waste Minimization Services
Explosive Services
E-Waste Services
Hazardous and Non-Hazardous Waste Services
TSDF and 10-Day Transfer Facilities
Household Hazardous Waste Services
Lab Pack Services
Photo Recovery Program
Retail Environmental Waste Services
Sustainability Program
Air Emissions Permitting, Modeling
Construction of Landfill Caps, Vaults, Liners & Collection Systems
Environmental Site Assessments and Subsurface Investigations
Excavation, Transportation and Disposal
Facility Decontamination, Dismantling & Demolition
Manufactured Gas Plant (MGP) Site Investigation and Remediation
Pit, Pond & Lagoon Clean-out and Closure
Remedial Treatment System Design, Installation and Operations
Soil / Sludge Solidification and Stabilization
Tank Truck / ISO Cleaning Services
IBC Cleaning Services
Rail Cleaning Services
Hazardous / Non Hazardous Transportation Services
RhinoPro
RhinoScope
RhinoTrac
Chemical Cleaning Program
Industrial Cleaning Program
Lab Pack Program
Transportation Services
Health and Safety Services
Environmental Affairs Services
Chemical Spill Response
Biohazard Cleanup
High Hazard Response
Disaster Response
Emergency Waste Removal
Become A Vendor
Our Management Team
PSC Locations
Join the PSC Team
Contact PSC
Strategic Sourcing
Supplier Diversity
Our Values
PSC HOME
>>
Remediation Services
>>
Manufactured Gas Plant Site Investigation
Manufactured Gas Plant (MGP) Site Investigation and Remediation
PSC has been in the forefront of planning, managing and executing remedial programs at over 30 former manufactured gas plant (MGP) facilities since 1987.
PSC’s MGP services include:
•
Investigations
•
Full RI/FS projects
•
Risk assessments
•
Remedial design and/or remedial construction activities
PSC has developed a proven "turnkey" program to remediate coal-tar impact at former MGP sites, utilizing a remediation-driven approach with professional service support.
PSC's MGP program is comprised of a team that is 100% dedicated to obtaining closure for these sites. The team includes professional engineers, licensed geologists, construction managers, air-monitoring technicians, cost-control specialists, equipment operators and remedial technicians.
For further information about this service or any other service, contact us at:
PSCNow@PSCNow.com
For a typical MGP site remediation, PSC separates the project into four phases of activities:
•
Site Characterization
•
Remedial Design
•
Remediation
•
Post-Remediation
Remediation & Environmental Consulting Services
Air Emissions Permitting, Modeling
Construction of Landfill Caps, Vaults, Liners and Collection Systems
Environmental Site Assessments and Subsurface Investigations
Excavation, Transportation and Disposal
Facility Decontamination, Dismantling & Demolition
Manufactured Gas Plant (MGP) Site Investigation and Remediation
Pit, Pond & Lagoon Clean-Out and Closure
Remedial Treatment System Design, Installation and Operations
Soil/Sludge Solidification and Stabilization